School hall stage renovation.
A full renovation of the stage in a school’s multipurpose hall in Baldivis, completed in October 2026.
From an open, pale stage to a defined performance space.
The hall’s stage was open, pale blue and cluttered with loose timber steps and storage crates. We renovated the full stage area with new finishes, lighting, curtains and steps, so the school now has a proper performance space at the end of the court.
- Stage walls and ceiling painted black, with new downlights
- Full-width stage curtains across the back wall
- Full-width carpeted steps replacing loose timber steps and storage crates
- Stage floor sanded and recoated, with a new timber lip
- LED strip lighting along the full length of the front step
- Timber panelling, painted brickwork and new side steps with a handrail
The hall
Seen from the far end of the court. The open, pale-blue stage is now a dark, defined stage front with lighting and full-width curtains.
BEFORE
AFTERStage front
Loose timber steps and exposed storage crates replaced with full-width carpeted steps and a lit stage edge.
BEFORE
AFTERStage left
Black ceiling and walls with downlights, curtains across the back wall and timber panelling at the side entry.
BEFORE
AFTERStage edge
Stage floor sanded and recoated, new timber lip and LED strip lighting along the full length of the front step.
BEFORE
AFTERStage right
Painted brickwork and new steps with a handrail at the side entry, with the lit stage edge running through.
BEFORE
AFTER